AGC Hole 7 Project
Monday, September 3, 2012
Labor Day Results
Green is prepared for drainage and top soil
Packing the green
Green ready for drainage
Bunkers Shaped
Left side bunker
Right side bunker
Installing silt fabric and rock on east bank of pond
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment