Friday, September 28, 2012

Saturday, September 22, 2012

9/22/12 The Final Touches

Sod 


Laying sod around the pond.















Finished view















Watering sod















Sod around tees















Seeding the tees and fairways

8 black tee
















8 blue tee















7 Blue tee, cart path turn around














Sand traps are finished 

Left side















Left of the bunker will be fairway grass















Right side sand trap















Wednesday, September 19, 2012

9/16/12 seeding the green

Planting the Green

Spreading cores removed other greens on the course.














Spreading cores in the center of the green avoiding walking on the green.














Seeding the green after cores were spread.














Covered green with seed guard-allows light and water through.














Installing drip irrigation on bunker faces




Friday, September 14, 2012

update

Please become a follower and leave comments if you like. I would really enjoy reading some comments and see some opinions. Thanks Josh and the AGC Staff.

9/14/12 THE CART PATHS ARE IN!

Cart Paths


Start of the new cart path at 7 tee















More asphalt 















Looking towards 7 green















7 green turn around















Looking back towards 7 tee from 7 green turn around.














7 tee turn around















In front of the pond towards 8 tee.












Split to 8 tee and 8 fairway















8 tee turn around








9/13/12 prepping cart paths

Base for Cart Paths



Beginning of new cart path by 7 tee















Adding a level base for asphalt by 7 tee













   
Packing the Base















View of cart path from 7 green turn around.














8 tee cart path 















8 tee turn around















Pond Shoreline

Rock shoreline















Shoreline of 7 green















shoreline of 8 tee fabric holds rock from sliding














installing rock on shoreline





Wednesday, September 12, 2012

9/12/12 Hole 7 progress

Top base of green 
Leveling top base

Pushing the mix















14  truck loads of 80/20 peat sand mix from Plaisted Companies. 


Leveling Green

Installing irrigation and finishing drainage


Installing drainage by Right bunker















Back side Drainage















Main line trench
















Irrigation in front of Green















Pipe for Right side















8 Forward Tee